Waste Activated Sludge (WAS) Line

 

  • Directional Drill line under the median on Everest parkway
  • 20,000 Ft of pipe from Everest Plant to Pelican Parkway at Gleason Parkway
  • Duration of Project - 6 Months
  • Length of time on Everest Parkway 1-2 weeks of directional drilling
  • Restore to pre-existing condition any disturbed areas